Get In Touch
4132 W. Venus Way
Chandler, AZ 85226
info@axisair.com
Ph: 888.360.2739
Career Inquiries
careers@axisair.com
Ph: 888.360.2739
Apply Today
Vendor Inquiries
vendors@axisair.com
Ph: 888.360.2739
Quick Resources

Heat
Reference
Guide

1. Are you trying to adjust relative humidity or purify the air?
(Retail, Restaurant/Hospitality/Entertainment, Office Building, Hospital/Lab, Data Center, School, Nursing Home/Care Facility, Manufacturing)

 

2. Status of the facility?

under construction, complete (equipment down or missing) or supplemental (cooling for a specific space or task)

 

3. Square footage and ceiling height of the space? 

4. What conditions are they trying to create?

(Requested RH levels and or air changes)

 

5. What power is available, specifically volts/phase and amps?

Distance from power location to proposed unit location. Will tails, extension cords or cable ramps be required?

Construction Drying 

Typical Construction RH = 35%-55%

1 ton can cool/lower relative humidity = 400-1000 Square feet 

When calculating coverage for Dehumidifiers (Drymax XLs) – 800-1000 sqft per Dehumidifier

Air flow is key – more air movement the better – Use box or drum fans with units

Example Axis Unit Trane 3.5 ton = 3500 to 4000 Square feet, roll in space, turn on, run condensate drain line – will lower your RH to almost 50% 

50% RH is usually the key for building materials to drying quickly, (drywall, paint, concrete, fireproofing, wood framing) 

Air Change Calculation

Length X Width X Height = Cubic Square Feet 

Cubic Square Feet / 60 = CFM needed for one air change 

General Air Quality = 2 to 3 air changes per hour recommended

Mold Remediation = 4+ air changes per hour

Example – Air Quality Project – 100 x 75 x 18 ceiling height = 135,000 Cubic / 60 = 2250

2250 CFM needed for one air change, now multiple by 3 = 6750 CFM needed

Standard Delivery:

$150 for 45 Mile Delivery

$150 for 45 Mile Pickup

$300 Total Cost

Extended Delivery:

$150 for 45 Mile Delivery

$150 for 45 Mile Pickup

+ $5.00 Per Mile Over 45 Miles

Delivery Example: Destination is located 100 miles from the branch. 

$150 (45 Mile Standard) + $275 (55 Extended Miles x $5.00) = $425 Delivery Cost

$150 (45 Mile Standard) + $275 (55 Extended Miles x $5.00) = $425 Pickup Cost

$850 Total Cost

After Hours Delivery:

+ $250 On top of Standard Delivery Fees.

The below rates should be considered the minimum we charge when creating our contracts/proposals. The rates are subject to charge with the complexity and obstacles presented onsite.

Coming Soon…

The below rates should be considered the minimum we charge when creating our contracts/proposals. The rates are subject to charge with the complexity and obstacles presented onsite.

Coming Soon…

The below rates should be considered the minimum we charge when creating our contracts/proposals. The rates are subject to charge with the complexity and obstacles presented onsite.

Coming Soon…

Qualifying Questions

1. Are you trying to adjust relative humidity or purify the air?
(Retail, Restaurant/Hospitality/Entertainment, Office Building, Hospital/Lab, Data Center, School, Nursing Home/Care Facility, Manufacturing)

 

2. Status of the facility?

under construction, complete (equipment down or missing) or supplemental (cooling for a specific space or task)

 

3. Square footage and ceiling height of the space? 

4. What conditions are they trying to create?

(Requested RH levels and or air changes)

 

5. What power is available, specifically volts/phase and amps?

Distance from power location to proposed unit location. Will tails, extension cords or cable ramps be required?

Calculations & Sizing Parameters

Construction Drying 

Typical Construction RH = 35%-55%

1 ton can cool/lower relative humidity = 400-1000 Square feet 

When calculating coverage for Dehumidifiers (Drymax XLs) – 800-1000 sqft per Dehumidifier

Air flow is key – more air movement the better – Use box or drum fans with units

Example Axis Unit Trane 3.5 ton = 3500 to 4000 Square feet, roll in space, turn on, run condensate drain line – will lower your RH to almost 50% 

50% RH is usually the key for building materials to drying quickly, (drywall, paint, concrete, fireproofing, wood framing) 

Air Change Calculation

Length X Width X Height = Cubic Square Feet 

Cubic Square Feet / 60 = CFM needed for one air change 

General Air Quality = 2 to 3 air changes per hour recommended

Mold Remediation = 4+ air changes per hour

Example - Air Quality Project - 100 x 75 x 18 ceiling height = 135,000 Cubic / 60 = 2250

2250 CFM needed for one air change, now multiple by 3 = 6750 CFM needed 

Spec Chart

Delivery

Standard Delivery:

$150 for 45 Mile Delivery

$150 for 45 Mile Pickup

$300 Total Cost

Extended Delivery:

$150 for 45 Mile Delivery

$150 for 45 Mile Pickup

+ $5.00 Per Mile Over 45 Miles

Delivery Example: Destination is located 100 miles from the branch. 

$150 (45 Mile Standard) + $275 (55 Extended Miles x $5.00) = $425 Delivery Cost

$150 (45 Mile Standard) + $275 (55 Extended Miles x $5.00) = $425 Pickup Cost

$850 Total Cost

After Hours Delivery:

+ $250 On top of Standard Delivery Fees.

Materials

The below rates should be considered the minimum we charge when creating our contracts/proposals. The rates are subject to charge with the complexity and obstacles presented onsite.

Coming Soon...

Labor

The below rates should be considered the minimum we charge when creating our contracts/proposals. The rates are subject to charge with the complexity and obstacles presented onsite.

Coming Soon...

Trouble Shooting
Coming Soon...
Day / Week / Month

Electric

Day / Week / Month

Direct Fired

Day / Week / Month

Indirect Fired

Day / Week / Month

Make-Up-Air

Day / Week / Month

Trailer Units

Day / Week / Month

AC / Heat Pump